Road Reconstruction

Transportation Vernon, 2012

Vernon Roadway Reconstruction Program



Vernon Roadway Reconstruction Program, Vernon, CT

Cardinal provided complete engineering services for the reconstruction of over twelve (12) miles of Urban and Rural Collector streets in Vernon. Cardinal services included surveying, roadway design, drainage design, contract administration, and full-time resident engineering services for ten (10) construction contracts.

The project included three (3) miles of pavement reclamation, as well as nine (9) miles of complete roadway reconstruction with minor geometric improvements, traffic calming, full-depth pavement reconstruction, subsurface drainage, six (6) miles of new storm drainage, culvert improvements, water, gas, telephone and electrical relocations and sanitary sewer improvements.

Safety improvements included intersection improvements, roadway realignments to improve sight distance, traffic calming including textured crosswalks, granite curbing, shoulder striping, police pull-out areas, interactive speed signs, and enhanced pavement markings and traffic signage.

Cardinal also conducted 20 public information meetings and assisted the Town in obtaining supplemental funding for this program with four-phased STEAP grants.

Road Reconstruction Program, Moutain & Webster Streets, Vernon, CT
Mountain & Webster Streets
Road Reconstruction Program, Vernon, CT
Hatch Hill Road
Road Reconstruction Program, Bolton Road, Vernon, CT
Bolton Road

Project Completion: 2012 / Project Cost: $20,000,000