The Town of Cheshire retained Cardinal Engineering to design plans for the dredging of Weeks Pond. This project involved the removal of sediment from the forebay of Weeks Pond. Sediment depths survey, HEC-RAS analysis to establish the 100-year floodplain, staging plans and hydraulic computations for permits were provided. The project will be constructed in two phases: Phase 1 consists of preparation of the sediment dewatering area, construction of access roads, construction of a stone access ramp and check dam. This work will be performed by the the Town of Cheshire DPW. Phase 2 will involve hiring a contractor with a crane and drag-line excavator for removal of the sediment. Hauling and spreading the sediment will be by the Town of Cheshire DPW.