Cardinal Engineering Associates - 55 years of excellence

Cardinal Engineering Associates provided construction contract administration and resident engineering services for the replacement of Bolton Road Bridge (Bridge No. 03933) over the Tankerhoosen River in the town of Vernon, Connecticut. This project was funded under the State Local Bridge program.

This project involved the replacement of an existing stone masonry arch structure with a 24 ft. by 6 ft. precast concrete arch structure. Stone masonry facing was installed on the facing of the concrete spandrel walls and parapet and approach walls.

Construction included the installation of permanent sheet piling to provide scour protection. Abutment footings, U-walls, and spandrel walls were constructed of cast-in-place reinforced concrete.

Construction took place in an environmentally sensitive area within the Belden Nature Preserve.

Special precautions were required during construction to minimize environmental impacts including protection of several endangered species present in the area.

client contact information


© Copyright All Rights Reserved | Cardinal Engineering Associates | Excellence in engineering since 1962

×