The purpose of this $4 Million project was to implement the recommendations from the Inflow/Infiltration Study and the 1998 Sewer System Evaluation Survey.

Cardinal completed design for the rehabilitation of 7,000 linear feet of the 42" diameter Berlin Interceptor along the Mattabassett River and 3 miles of collector sewers. The Berlin interceptor conveys all of the sanitary flow from the town to the Mattabassett District Trunk Sewer.

In addition, Cardinal provided the following: Manhole Inspection, Survey, Wetland Delineation, Design, Environmental Permitting, Bidding, Construction and Contract Administration and Resident Project Representation services. Design was completed in 2011. Construction is scheduled to be completed in 2012.