In 2008 Cardinal Engineering was retained by the Town of Deep River to conduct a feasibility study and design plans of the Kirkland/River Street area.

Upon completion of the feasibility study an alternative was selected and the Town decided to move forward with design plans for the extension of sewers into the Kirtland/River Street area adjacent to the Connecticut River to eliminate failing septic systems.

The selected alternative included extending the existing municipal sewer system by the installation of new gravity (9,000lf.) and force main (2,000lf.) sanitary sewers, including two pumping stations. The estimated construction cost is $4,000,000.